Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.11889/5955
Title: | Evaluation of operational stress conditions on a pilot scale MBR for westewater treatment and reuse | Other Titles: | تقييم ظروف الإجهاد التشغيلية لمشاهدة مفاعل غشاء حيوي في معالجة المياه العادمة وإعادة استخدامها | Authors: | Nazzal, Mazen | Keywords: | Sewage - Purification - Biological treatment - Palestine;Membrane reactors - Palestine;Membrane (Technology) - Permeability | Issue Date: | 2017 | URI: | http://hdl.handle.net/20.500.11889/5955 |
Appears in Collections: | Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
TD755.N39 2017.pdf | 1.85 MB | Adobe PDF | View/Open |
Page view(s)
177
Last Week
1
1
Last month
4
4
checked on Mar 25, 2024
Download(s)
61
checked on Mar 25, 2024
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.